There are instances where the customer's cooling demand load, or Demand Load, is not accurately reflected in the actual consumption of the building, often due to open spaces.
.
In such cases, an Improper Design Load may have been adopted in the building's original design. This results in a demand that exceeds the design capacity of the HVAC system, leading to unnecessary extra costs for the district cooling plan